Vermont · Step-by-step guide

How to sign a compliant Vermont lease.

A practical walkthrough of the six things a Vermont landlord must get right, in order, before and after signing.

Start My Vermont Lease →

1. Confirm the deposit cap

No statutory cap (some cities cap). Statutory cite: 9 V.S.A. § 4461.

2. Set late-fee terms correctly

Must be reasonable; no statutory cap

3. Plan entry notice

Give at least 48 hours' notice before entering the unit outside an emergency.

4. Give correct termination notice

60/90 days (tenancy length) for a month-to-month tenancy.

5. Attach every required disclosure

Lead-based paint (EMP), Mold and habitability.

6. Return the deposit on time

14 days. Statutory cite: 9 V.S.A. § 4461.

Vermont guide FAQs

What order should a Vermont landlord follow before signing a lease?
Confirm the deposit cap, set a compliant late fee, plan entry-notice language, set the correct termination notice, attach every required disclosure, and confirm the deposit-return timeline — in that order.
Where can I find the full list of Vermont required disclosures?
See the full disclosure list on the Vermont state page, or browse disclosure requirements by topic across all states.

Related Vermont resources